NewsCurrent Road Projects321

321 Widening Project Expected To Resume Due To Better Weather

Last Updated on March 16, 2015 3:41 pm

Though the High Country is not totally out of the threat for winter weather for several more weeks, the improved weather conditions are allowing for more consistent work to resume on 321 in Blowing Rock.

Caprice Cheek, NCDOT Engineering Technician, says that with moderating temperatures and improving weather conditions in the forecast, construction operations are anticipated to begin resuming on a more regular basis. On Monday (March 16) the schedule included flagging and lane closures at the intersection of 321 and Tanger Outlets. Motorist are advised to expect and be prepared for delays again as work resumes.

For more information regarding construction operations or for general project information, please call 828-964-3260

Back to top button